Capabilities / Inspection

Inspection you can rely on

A part is finished when it has been proven to the drawing. Our people are skilled in geometric tolerancing and current inspection procedures.

How we verify

Built into the job, start to finish

Inspection is planned with the job and carried through every stage of it.

01

Planned up front

How each feature will be measured is decided when the job is planned, alongside tooling and workholding.

02

Checked in process

Machinists verify their own work as it runs, so a problem is caught at the machine and not at the dock.

03

Verified at the end

Finished parts are inspected against the drawing before they ship, under our certified system.

People

Fluent in GD&T

Geometric dimensioning and tolerancing is the language aerospace and defense drawings are written in. Reading it correctly decides how a part is fixtured, cut and measured.

Our personnel are skilled in geometric tolerancing and the latest inspection procedures, and are committed to delivering products of exceptional quality.

Documentation

Tell us what your program needs

Documentation requirements vary by customer and by program. Include yours with the request for quote, for example first article reports, material certifications or certificates of conformance, and we will quote the job to them.

Our business management system applies to all activities of the company and is certified to ISO 9001:2015 / AS9100D.

Have a demanding drawing?

Send it over. We will review the tolerances and tell you how we would approach it.

Request a quote